With the aim of reducing energy consumption and fostering a more sustainable future, GRUPO CADARSO has implemented a state-of-the-art photovoltaic system at its Logistics Centre in Montmeló. This installation, completed in February 2024, includes a 60 kW inverter by Huawei and 132 solar panels of 475 Wp each from Jinko, with an estimated annual generation capacity of 100 MWh.
To date, the system has generated 75 MWh, preventing the emission of 36 tonnes of CO₂ into the atmosphere—an environmental contribution equivalent to the regeneration of 50 trees. This initiative reflects our commitment to environmental responsibility and brings us one step closer to a more sustainable and responsible operation.
Through this effort, we aim to significantly reduce our environmental footprint, contributing to a more efficient business model that is respectful of the planet.
Project supported by the incentive programme for self-consumption and energy storage using renewable energy sources, within the framework of the Recovery, Transformation and Resilience Plan, funded by the European Union – NextGenerationEU.
Programme 1: Self-consumption installations using renewable energy sources in the services sector, with or without storage.
- Beneficiary: GENERAL DE RELOJERIA, S.A
- Total investment: 42.965,90 €
- Grant amount: 10.741,48 €
- Installed capacity: 62,70 kWp
- Royal Decree: 477/2021

